Monday, March 31, 2008

On the Road again

Seven and a half inches of snow fell in 3 hours in March while we were being repaired. We were thankful they allowed us to stay in the building as we had no front door!
How we looked the day they started the repairs
After first day of repairs. We went without a door for eight days.
Ready for the paint shop and sanding
First day in the paint booth
Almost ready, still need finishing touches and a wash job.
All done and in our first campground since the repairs, Lake Twawkoni, TX
All repaired and better than ever, the 'new' Tweety!


After 39 days (we waited two weeks for the parts to come in) we are better than new! Our new Mexico Tweety suffered damage in the accident and even he is better than new now. God was definitely in control as the trailer we are picking up in GA wasn't ready when we had planned to pick it up. It should be ready Friday, Apr 4 and we are on our way there now. Also Larry was able to sign the repair facility up as an Amsoil account which is a really big plus as they have lots of vehicles and equipment that will benefit from Amsoil products.

If you ever need body repair to your RV or vehicles and are near Denton, TX we highly recommend North Texas RV Repair. They do a super job and are well worth the added miles to get to them!